In short
There is no fixed price for a factory relocation. Cost depends on the number and weight of machines, the need for cranes and forklifts, distance, the number of phases and working hours. An accurate price comes from a site survey and a detailed, phased quote.
What affects the price
- Number, weight and size of machines.
- Lifting equipment: forklifts, heavy skates or a crane.
- Access: floors, ramps, openings and truck parking.
- Distance between buildings.
- Phased, night or weekend work.
How to save
- Sell or dispose of equipment that is not moving before the move.
- Prepare an equipment list and a floor plan for the new building.
- Appoint one decision-maker on site.
- Book electricians and technicians in advance so nobody waits.
What to ask for in a quote
- A breakdown by phase and equipment type.
- What is included: lifting gear, packing, disassembly and reassembly.
- Insurance details and cover.
- Schedule and who manages the project.